MTA Triborough Bridge and Tunnel Authority/Brooklyn Battery Tunnel/Cross Bay Veterans Memorial Bridge/Throgs Neck Bridge
Performed asbestos and lead abatement project monitoring OSHA air monitoring and area air monitoring. Prepared design documents, specifications and drawings to facilitate the proper removal, collection, handling, storage, classification, testing, transportation and disposal of the asbestos/lead containing materials in accordance with all applicable laws, codes, rules and regulations.