Creative Environment Solutions Corp.

NYC Transit (NYCT)/MTA/LIRR East Side Access

New York, NY

On a team with Shaw (formerly Stone & Webster Engineering) provided survey, design and monitoring during preparation of the abandoned East River tunnel for incorporation into the new East Side Access line.  The work included abatement for over two miles of tunnel containing over 100 transit cable sleeves embedded in concrete and preparation of the concrete floor for the transportation of TBM (tunnel boring machine) to the tunnel rock face on the Manhattan side. Worked in extreme winter weather conditions that required creative means of providing logistics to the work crews.

Project Highlights

Contact Us

Creative Environment
Solutions (CES) Corp.
39 West 37th Street
14th Floor
New York, NY 10018
Get Directions
 
212.290.6323 office
212.290.6325 fax
888.CES.9951 emergency
info@cescenter.com